Well, I think that promising to blog daily was a lot to ask of myself considering we were working 12-14 hour days on the new studio. The bank holiday weekend work went really well, we got everything done we were hoping to. We now have a fire door, new walls, new kitchen (not up and running but installed), a new floor, and a completely white room. It's amazing the amount of work involved in creating a good blank canvas to work in. The amount of rubbish we have removed has filled two skips!!


Day One: After the kitchen wall had been removed - a very dirty, noisy and hard job. Kay was frightening with the sledge hammer!!


Day One: Room completely cleared, batons fixed to the wall ready for the foil backed plaster board. Me treating the walls for damp. (Got to remove all the ivy that has built up on the outside at some point)


Day Two: Plaster board up, polyfiller in holes.



Day Three: Floor down


Day Three: Kitchen started to being installed, decorating started.



Throughout the whole time Harry looking in on us!!


Day Four: Kitchen Installed, Door finished.

While the three of us were working (Kay, Jon and I) my little sister Lucy was away on holiday. Lucy got back on Monday and since then we have continued with the decorating. Got a little more to do but we're almost finished. I've had to try and get things in the shop back to normal this week so have been teaching workshops, private tuition and organising the shop. Today I have an Introduction to Precious Metal Clay to teach. Lucy is going to finish the painting then she has a childrens workshop to teach. Another busy day for us all!

1 comment:

  1. Looks Fantastic Amy, well done on all your hard work. I must pop by and have a look soon. Take Care Jen x